Auxiliary systems for the power plant industry

Over 50 projects in auxiliary systems for the power plant industry

With more than 20 years of experience and over 50 completed projects for national and international clients, Tehado has built up extensive expertise in the design and realisation of auxiliary systems for the power plant industry. Our projects include more than 200 different modules that are essential for the reliable operation of power plants, such as fuel treatment, filtration, piping and supporting process installations.

These auxiliary systems ensure that fuels and other process media are supplied, treated and transported under the correct conditions. They contribute to stable production processes, efficient plant operation and reduced downtime and maintenance. A well-designed and integrated auxiliary system is therefore essential for the availability and performance of a power plant.

From engineering and component selection to assembly and system integration, Tehado translates the technical and operational requirements of each project into a suitable solution. Our experience with a wide range of projects enables us to take into account the specific conditions of each installation and deliver systems that operate reliably, efficiently and with ease of maintenance.

© 2026 Tehado Engineering B.V.